Project Cost: $2 mil
Date Completed: 2018
Location: Bettendorf, IA
The new school is a three-section building, spanning 62,500 sq. ft. It was built to replace to former 37,000 sq. ft. building that was built in 1960. The new building cost $13.7 million. The school will house pre-k through 5th grade. Some of the features include: large classrooms, breakout areas throughout the building, multipurpose conference area with natural lighting, commons area, learning stairs, and a library. Tricon performed the foundations and pre-cast concrete for this new school.