Project Description
Water Pollution Control Facility
Bio-Solids: $9.1 mil
Ash Lagoon: $1.1 mil
Roughing Filter Dome: $7.1 mil
Flood Wall: $5.8 mil
Location: Cedar Rapids, IA
Tricon has performed $23 million worth of work at this major utility complex over the last five years.
The Bio-Solids project involved rebuilding the intricate waste burner system, part of which included materials from Germany and Switzerland. The construction also included titanium tube replacement, instrumentation and control systems, industrial gas fire burners, and heavy steel fabrication.
Roughing Filter Domes 1, 2, 3, and 4 have all been replaced by Tricon. This includes concrete rehabilitation and the 146’ clear span domes.
Click on an image below to view in slideshow